RVK Architects Logo

St. Mary’s University St. Louis Hall

35,600 SF | San Antonio, TX | 2012

RVK was hired to design renovations to St. Louis Hall in order to meet current building, fire and life safety codes. Construction included the removal of existing infrastructure to be replaced with new energy efficient systems, including complete replacement of HVAC, electrical, and lighting, plus installation of a fire sprinkler system. Renovation and infrastructure replacement also allowed the opportunity to remove all existing asbestos, install new ceilings, new wall finishes and floor coverings.